Discover the living ironstone museum in the heart of Rutland.
The railway trackwork needs good drainage and the team made sure that the new platform track bed included a deep lateral drain running to the existing drainage system. Using protective matting under a layer of limestone hard core, the required substrata were gradually installed. Once in position and connected to the existing manhole, the limestone…